|
|
 |
 |
Well-planned Sewer and Water Infrastructure
Businesses
locating in Cambridge can be assured that the City's sewer
and water infrastructure is well-planned and managed. A
long term Capital Improvement Plan brings together engineering
and financial considerations, ensuring smooth operation
and predictable costs for these essential services.
Back to top
|
print this page
|
|
 |
| |
| "The Cambridge Wastewater
Treatment Facility has been recognized for excellence in
both engineering and operations. Built in 1994, the facility
was designed to operate at maximum efficiently while
conserving and protecting valuable natural resources, including
the Rum River." |
 |
| |
Todd Schwab, Assistant Public Works
Director
City of Cambridge |
|
 |
|