Well-planned Sewer and Water Infrastructure
Businesses
locating in Cambridge can be assured that the City's sewer
and water infrastructure is well-planned and managed. A
long term Capital Improvement Plan brings together engineering
and financial considerations, ensuring smooth operation
and predictable costs for these essential services.
 |
 |
|
Dependable Water Service
|
 |
 |
 |
|
Provider
|
 |
City of Cambridge
|
 |
 |
 |
|
Water Source
|
|
Wells
|
 |
 |
 |
|
Storage Capacity
|
|
1.3 million gallons
|
 |
 |
 |
|
Pumping Capacity
|
|
2,700 gallons/minute
|
 |
 |
 |
|
Average Demand
|
|
960,000 gallons/day
|
 |
 |
 |
|
Peak Demand
|
|
1.8 million gallons
|
 |
 |
 |
|
Total Water Hardness
|
|
300 ppm
|
 |
 |
 |
|
Industrial Water Rate
|
|
per 1000 gallons
| 0 to 6,000 |
$3.00 |
| 6,001 to 20,000 |
$3.50 |
| Over 20,001 |
$4.00 |
|
| |
| |
|
Award-Winning Wastewater Treatment
Facility
|
 |
 |
 |
|
Provider
|
|
City of Cambridge
|
 |
 |
 |
|
Treatment Type
|
|
Extended aeration
|
 |
 |
 |
|
Capacity of Plant
|
|
1.84 million gallons/day
|
 |
 |
 |
|
Average Demand
|
|
897,000 gallons/day
|
 |
 |
 |
|
Peak Demand
|
|
1,404,000 gallons/day
|
 |
 |
 |
|
Usage Charge
|
|
per 1000 gallons
| 0 to 6,000 |
$2.30 |
| 6,001 to 20,000 |
$2.70 |
| Over 20,001 |
$2.90 |
|
| |
| |
|
Back to top
|
print this page
|
|
 |
| |
| "The Cambridge Wastewater
Treatment Facility has been recognized for excellence in
both engineering and operations. Built in 1994, the facility
was designed to operate at maximum efficiently while
conserving and protecting valuable natural resources, including
the Rum River." |
 |
| |
Todd Schwab, Assistant Public Works
Director
City of Cambridge |
|
 |
|